# HRIS Implementation Done Right: A 7-Phase Field Guide for HR Leaders 

Last Reviewed: August 13, 2026 25 min read [1 comment](https://www.selecthub.com/hr-management/key-considerations-implementing-hr-system/#comments) 

[ ![Ritinder Kaur](https://www.selecthub.com/wp-content/uploads/2021/06/cropped-Ritinder-Kaur-v2-1-96x96.png) ](https://www.selecthub.com/author/ritinder-kaur/) [Written by Ritinder Kaur](https://www.selecthub.com/author/ritinder-kaur/) 

HR Tech Writer 

[ ![Zachary Totah](https://www.selecthub.com/wp-content/uploads/2020/07/Zac-96x96.jpg) ](https://www.selecthub.com/author/zachary-totah/) [Edited by Zachary Totah](https://www.selecthub.com/author/zachary-totah/) 

Content Manager & Editor 

[ ![Cory Ondo](https://www.selecthub.com/wp-content/uploads/2026/01/Cory-Ondo-96x96.png) ](https://www.selecthub.com/author/cory-ondo/) [Contributions by Cory Ondo](https://www.selecthub.com/author/cory-ondo/) 

SVP, Implementation & Customer Service 

[ ![Brian Rivers](https://www.selecthub.com/wp-content/uploads/2026/01/Brian-96x96.png) ](https://www.selecthub.com/author/brian-rivers/) [Contributions by Brian Rivers](https://www.selecthub.com/author/brian-rivers/) 

HR Implementation Leader 

Table of Contents

Explore the HR Hub

What's your top priority today?

* [Learn](#)  
  * [What is HR Management?](https://www.selecthub.com/hr-management/hrm/)
  * [HRIS vs. HRMS vs. HCM](https://www.selecthub.com/hr-management/difference-hcm-hrms-hris/)
  * [What is HRMS?](https://www.selecthub.com/hr-management/hrms/)
  * [HR Tech & Trends](https://www.selecthub.com/hr-management/hr-trends/)
* [Plan](#)  
  * [HR Software Requirements](https://www.selecthub.com/hr-management/hr-software-features-requirements-list/)
  * [HR Software Pricing](https://www.selecthub.com/hr-management/hr-software-pricing/)
  * [HRIS RFP](https://www.selecthub.com/hr-management/hris-rfp/)
* [Compare](#)  
  * [Best HR Software](https://www.selecthub.com/c/hr-management-software/)
  * [Best Employee Management Software](https://www.selecthub.com/hr-management/tools-for-employee-management/)
  * [Best Free HRMS Software](https://www.selecthub.com/hr-management/free-hrms-software/)
  * [Best HR Apps](https://www.selecthub.com/hr-management/the-three-types-of-hr-applications/)
  * [Workday Competitors](https://www.selecthub.com/hr-management/workday-competitors-alternatives/)
  * [Workday vs. SAP SuccessFactors](https://www.selecthub.com/hr-management/workday-and-successfactors/)
* [Launch](#)  

  * HR System Implementation
    * [Phase 0: Are You Actually Ready to Implement?](#Phase%5F0%5FAre%5FYou%5FActually%5FReady%5Fto%5FImplement)
      * [Run a Readiness Check](#Run%5Fa%5FReadiness%5FCheck)
    * [Phase 1: Build the Team and Define What “Success” Means](#Phase%5F1%5FBuild%5Fthe%5FTeam%5Fand%5FDefine%5FWhat%5F%E2%80%9CSuccess%E2%80%9D%5FMeans)
      * [Assemble a Core Team That Can Actually Deliver](#Assemble%5Fa%5FCore%5FTeam%5FThat%5FCan%5FActually%5FDeliver)
      * [Define Success Criteria and Constraints](#Define%5FSuccess%5FCriteria%5Fand%5FConstraints)
      * [Lock Down Scope for the Deployment](#Lock%5FDown%5FScope%5Ffor%5Fthe%5FDeployment)
    * [Phase 2: Build Your HRIS Implementation Project Plan](#Phase%5F2%5FBuild%5FYour%5FHRIS%5FImplementation%5FProject%5FPlan)
      * [Set Up Governance and Decision Cadence](#Set%5FUp%5FGovernance%5Fand%5FDecision%5FCadence)
      * [Plan Change Management Early](#Plan%5FChange%5FManagement%5FEarly)
      * [Protect Capacity, Budget, and Risk](#Protect%5FCapacity%5FBudget%5Fand%5FRisk)
      * [Define Progress Markers](#Define%5FProgress%5FMarkers)
    * [Phase 3: Clean Up Data and Get Your Processes on Paper](#Phase%5F3%5FClean%5FUp%5FData%5Fand%5FGet%5FYour%5FProcesses%5Fon%5FPaper)
      * [Document How Work Actually Happens](#Document%5FHow%5FWork%5FActually%5FHappens)
      * [Inventory Every Data Source](#Inventory%5FEvery%5FData%5FSource)
    * [Phase 4: Translate Requirements Into System Rules](#Phase%5F4%5FTranslate%5FRequirements%5FInto%5FSystem%5FRules)
      * [Define the Business Logic](#Define%5Fthe%5FBusiness%5FLogic)
      * [Write UAT Scenarios Before Configuration Starts](#Write%5FUAT%5FScenarios%5FBefore%5FConfiguration%5FStarts)
      * [Choose Your Migration Strategy](#Choose%5FYour%5FMigration%5FStrategy)
    * [Phase 5: Build With Your Vendor (Without Losing Control)](#Phase%5F5%5FBuild%5FWith%5FYour%5FVendor%5FWithout%5FLosing%5FControl)
      * [Clarify Ownership Between You and the Vendor](#Clarify%5FOwnership%5FBetween%5FYou%5Fand%5Fthe%5FVendor)
      * [Run Early System Testing](#Run%5FEarly%5FSystem%5FTesting)
      * [Protect Non-Negotiables & Decide Where to Compromise](#Protect%5FNon-Negotiables%5FDecide%5FWhere%5Fto%5FCompromise)
    * [Phase 6: User Acceptance and Go-Live Simulation](#Phase%5F6%5FUser%5FAcceptance%5Fand%5FGo-Live%5FSimulation)
      * [Validate Core End-to-End Scenarios (UAT)](#Validate%5FCore%5FEnd-to-End%5FScenarios%5FUAT)
      * [Test the Edge Cases](#Test%5Fthe%5FEdge%5FCases)
      * [Do a Dry Payroll Run](#Do%5Fa%5FDry%5FPayroll%5FRun)
    * [Phase 7: Go-Live and the First 12 Weeks (Hypercare)](#Phase%5F7%5FGo-Live%5Fand%5Fthe%5FFirst%5F12%5FWeeks%5FHypercare)
      * [Week 1-2: Intensive Monitoring](#Week%5F1-2%5FIntensive%5FMonitoring)
      * [Weeks 3-12: Stabilization](#Weeks%5F3-12%5FStabilization)
      * [Close Out Hypercare](#Close%5FOut%5FHypercare)
    * [The First Year After Go-Live: From Stabilization to ROI](#The%5FFirst%5FYear%5FAfter%5FGo-Live%5FFrom%5FStabilization%5Fto%5FROI)
      * [Measure Impact Against Your Original Purpose](#Measure%5FImpact%5FAgainst%5FYour%5FOriginal%5FPurpose)
      * [Capture Lessons Learned](#Capture%5FLessons%5FLearned)
      * [Plan the Next Iteration](#Plan%5Fthe%5FNext%5FIteration)
    * [Implementation Is Hard, Structure Makes It Manageable](#Implementation%5FIs%5FHard%5FStructure%5FMakes%5FIt%5FManageable)

  * [HRIS Integration](https://www.selecthub.com/hr-management/hris-integration/)

Key Takeaways

* Assess your readiness first. Understand the risks and confirm leadership buy-in, team availability, and data quality before committing to a timeline.
* Build your team and lock down the scope and success metrics. Assign decision-makers, define roles, and lock the scope.
* Get your house in order. Document your workflows, clean data, and build your UAT before configuration starts.
* Perform rigorous testing in pre-production. Run end-to-end and parallel tests to catch issues early.
* Treat Year I post-go-live as part of the project. Stabilize the system and evaluate the outcomes as your HR system becomes part of daily operations.

Once you’ve chosen an [HR platform](https://www.selecthub.com/c/hr-management-software/), the next challenge is a smooth HRIS implementation — all while you’re juggling a range of other priorities. With so much riding on the success of your new system, feeling overwhelmed is natural.

To help map out your rollout, I turned to a couple experts — Cory Ondo, Senior Vice President, Implementation & Customer Service at Paycor, and Brian Rivers, Director of Professional Services at PDS, both of whom have rich experience in guiding organizations through multi-module, complex HR platform rollouts. I also talked to Sandesh Sindiri, Senior Director of Software Solutions & Technology Research here at SelectHub.

In this guide, I’ll share their practical, on-the-ground tips and advice and walk you through the seven critical phases of an HR system implementation, from assessing your readiness to navigating the first year after go-live.

![HRIS Implementation Phases]()

## Phase 0: Are You Actually Ready to Implement?

Phase 0 helps you assess whether your foundation is solid enough to move forward with the rollout.

You may already sense that you’re not ready to get the ball rolling. The signs are there: no dedicated project team, critical data locked in legacy systems, and teams wanting different things. None of these gaps are trivial, but when unresolved, they tend to compound over time.

As [Cory](https://www.linkedin.com/in/cory-ondo-66a85313) told me:

![Cory Ondo]()

Implementations rarely fail because of a single mistake. When they do fail, it’s often because small issues add up.

Cory Ondo

Senior Vice President, Implementation & Customer Service, [Paycor](https://www.paycor.com/)

In Brian’s experience, HR software implementations succeed when organizations start with clean data, a committed and knowledgeable project team, and strong communication supported by change management. Those are exactly the conditions Phase 0 is designed to validate.

### Run a Readiness Check

Before moving forward, assess if you’re ready to roll out your HR system. Any uncertainty here points to issues that will surface later, when they’re harder and costlier to fix.

![HRIS Implementation Readiness Checklist]()

**Leadership, Governance & Team Capacity**

* Do you have an engaged executive sponsor? If not, ask a senior leader to step in, even temporarily, to champion the project and provide visibility to stakeholders.
* Can key team members (HR, IT, payroll, finance) realistically commit to the timeline? Build a phased approach to enable a lean team to focus on one thing at a time.

**Data & Process Readiness**

* Will clean, consistent data be available for migration? This is a non-negotiable — devote time upfront to clean and standardize the data, even if it means delaying the rollout.
* Are HR processes standardized across locations and roles? Map the most common processes and agree on a baseline for the rollout. Refine the rest post go-live.

**Scope & Budget Discipline**

* Are requirements and success criteria clearly defined? Run a quick workshop with key stakeholders to define your top 3-5 requirements and success metrics.
* Does your budget account for training, change management, and post-go-live enhancements? Plan for \~15-20% of license cost for training and change management, plus \~10% annually for enhancements.

If one or two areas need work, that’s normal. If several of them are unclear or dependent on “we’ll figure it out later,” you should slow down and assess not just your readiness, but intent.

[Brian](https://www.linkedin.com/in/brian-rivers-904bb9/) shared a simple litmus test you can use:

![Brian Rivers]()

If leaders can’t articulate the purpose in one sentence, you’re not ready.

Brian Rivers

Director of Professional Services, [PDS](https://www.pdssoftware.com/)

**Signs You’re Ready** You have an engaged sponsor, committed SMEs, documented processes, and leadership consensus on why you’re doing this. Only then should you move to Phase 1.

## Phase 1: Build the Team and Define What “Success” Means

Success depends on three things: a dedicated team, defined scope, and measurable success criteria. This is where you lay the groundwork that prevents confusion and rework later.

### Assemble a Core Team That Can Actually Deliver

Finding dedicated resources to put together a project team can be hard, but the earlier it’s in place, the faster everything else moves.

The biggest predictor of success, according to Cory, is whether stakeholders are prepared for the change and actively engaged in the process. That preparation starts here.

At a minimum, your core team should include:

| **Role**             | **Person**                                 | **Responsibilities**                                                                                |
| -------------------- | ------------------------------------------ | --------------------------------------------------------------------------------------------------- |
| Executive Sponsor    | VP, director, C-suite leader               | Owns outcomes, funding, and resolves major disagreements. Approves major scope changes.             |
| Project Owner        | Business leader, department head           | Owns timeline, scope, and risks. Makes daily decisions and escalates critical issues.               |
| HR Lead              | Senior HR professional, HR department head | Owns HR requirements, process design and success metrics.                                           |
| IT Lead              | Senior IT professional, IT manager         | Oversees integrations, security, and technical architecture. Sets technical and security standards. |
| Payroll/Finance Lead | Senior payroll/finance manager             | Owns pay rules, GL mapping, and compliance. Approves payroll and financial controls.                |

### Define Success Criteria and Constraints

Define what “done” means using measurable outcomes. “Improve reporting” is difficult to track, but “executives can generate headcount reports in under 5 minutes without IT assistance” is measurable.

Here are some examples of success metrics:

* Payroll runs accurately with zero manual corrections by month two
* Manager self-service adoption reaches 70% by month three
* HR admin time drops by 20 hours per week within six months

Next, document your constraints so everyone understands the boundaries.

* **Your budget sets the ceiling for what’s possible.** Be explicit about the total dollar amount and what percentage you’ve allocated to software, implementation services, training, and contingency.
* **Your implementation timeline establishes the hard deadlines**, particularly if you’re replacing a legacy system that’s being decommissioned or if you need to go live before a critical payroll cycle or benefits enrollment period.
* **Identify your non-negotiables, like payroll accuracy.** You might include regulatory compliance, data security standards, or specific workflows that are central to how your organization operates.

Once you have the guardrails set up, you can decide upon the scope.

### Lock Down Scope for the Deployment

In this step, it’s time to define exactly what the deployment will cover. Here’s what [Sandesh](https://www.linkedin.com/in/sandesh-sindiri/) recommends, based on what he’s seen work well for companies:

![Sandesh Sindiri]()

It’s always best to start with the core modules — HR, payroll and benefits — and then gradually bring in additional modules through a phased implementation.

Sandesh Sindiri

Senior Director of Software Solutions and Technology Research, SelectHub

Everything else that improves operations — employee self-service, performance management, advanced reporting — but isn’t critical ideally belongs on a “Later List.” The reason for this approach, Sandesh explained, is that rolling out modules in stages is often easier on teams, especially as they balance day-to-day work alongside implementation.

![Sandesh Sindiri]()

Compared to a unified go-live, a module-by-module approach is often better received by the organization and supports smoother change management.

Sandesh Sindiri

Senior Director of Software Solutions and Technology Research, SelectHub

**Signs You’re Ready**You’ve locked in the scope and success criteria, built the project team and are ready to move into detailed planning in Phase 2.

## Phase 2: Build Your HRIS Implementation Project Plan

In this phase, you’ll set clear decision paths, protect your team’s time, put governance and change management in place to keep the project moving forward, and define what progress looks like.

By the end of Phase 2, your team should have a project plan that answers:

* _Who decides what?_
* _How do we stay aligned?_
* _How do we communicate, manage change, and mitigate risks?_
* _How do we know the project is on track?_

Let’s look at the steps you need to get there.

![HRIS Implementation Project Plan]()

### Set Up Governance and Decision Cadence

In phase 1, you identified your core team and their responsibilities. In phase 2, you’ll focus on how they’ll make, approve, and escalate decisions together.  
Here’s a simple model:

* Your core team will use weekly working sessions to handle day-to-day decisions on configuration, data, and processes across HR, IT, and payroll.
* Your steering committee will include senior leaders who meet monthly (or as needed) to approve high-level scope, budget, and timeline decisions, and clear roadblocks.

If you need help mapping it out, use a [RACI matrix](https://www.aihr.com/blog/raci-template/) to capture who decides what, who gives input, and who simply needs to be informed.

### Plan Change Management Early

You can meet every technical requirement and still miss your goals if employees, managers, and leaders don’t adopt the new system. That’s why change management isn’t a “nice to have”. It’s business-critical.

I like how [this Reddit user](https://www.reddit.com/r/humanresources/comments/ppi3qn/comment/hd44mqw/) put it: change management ensures the system is fit for purpose — not just technically implemented, but actually usable by the business.

In Cory’s experience, the strongest predictors of HR software implementation success are clear communication, thorough planning, and early stakeholder engagement. Effective change management brings all three together, which means your plan should intentionally cover:

* **Ownership:** Assign a dedicated change lead
* **Communication:** Start early and increase frequency closer to launch
* **Training:** Use blended approaches — live interactions, short videos, FAQs
* **Audience mapping:** Tailor messages by role (executives, managers, employees)
* **Resistance planning:** Anticipate friction points and encourage managers to share quick wins
* **Adoption metrics:** Track logins, transactions, ticket volume, and sentiment

### Protect Capacity, Budget, and Risk

Your HRIS implementation project plan needs to reflect real-world constraints, not ideal conditions. One such restriction is SME bandwidth. Your subject-matter experts will be balancing deployment work alongside their day jobs.

Here are a few steps you can take to protect SME capacity:

* Make project work non-negotiable on calendars
* Backfill critical responsibilities or redistribute work where possible
* Rotate SMEs across phases to prevent burnout during longer rollouts

Budget discipline is just as important. Build a 10-15% contingency buffer to absorb the costs that commonly emerge mid-project, such as additional user training, unplanned configuration changes, or short-term consulting support.

And when you do end up spending more, it’s usually because something caused a delay, so you need to factor in a time buffer as well.

As Brian put it:

![Brian Rivers]()

Unexpected events — staff turnover, competing projects, shifting priorities — can drain resources. Building buffer time helps absorb these surprises without jeopardizing milestones.

Brian Rivers

Director of Professional Services, [PDS](https://www.pdssoftware.com/)

**Rule of thumb:** Add about two weeks of buffer for every three months of rollout.

### Define Progress Markers

Progress markers help teams keep track and spot issues early, before they compound. More importantly, they provide a shared definition to the entire team of what “on track” actually means at each stage of the rollout.

Here’s an example of how progress markers might look during an HR system implementation:

* **By week 4:** Payroll runs cleanly without manual corrections
* **By week 8:** Support ticket volume is trending down
* **By week 12:** Your team is shifting from reactive fixes to proactive optimization

This timeline is merely illustrative and may look different for your org. The goal is to define checkpoints that signal system stability and adoption. These markers also set you up to run effective system reviews later, with clear ownership and accountability.

**Signs You’re Ready** Your team is aligned on governance, decision cadence, and change management, and they’ve documented everything.

## Phase 3: Clean Up Data and Get Your Processes on Paper

You’re probably dreading finding out just how messy your processes and data might be and wondering whether you’ve underestimated the cleanup effort. This phase replaces that uncertainty with clarity, so the vendor can build a system that works the way you expect.

To get there, you need to clearly outline exactly how your teams perform tasks and what data sources you use.

### Document How Work Actually Happens

Before the vendor can configure anything, you need a clear picture of how work runs today — not how it’s supposed to work on paper.

Capture full scenarios: hiring, transfers, leave, and exceptions. Include the unofficial spreadsheets, handoffs, and approval workarounds people rely on every day. Many of these processes live only in people’s heads. If they’re not documented now, they’ll surface later as configuration gaps.

### Inventory Every Data Source

Start by pulling employee and organizational data from every HR-linked system: HRIS, payroll, time tracking, benefits platforms, and any departmental databases, such as ATS, finance, and performance management systems.

Next, identify the single authoritative source for each field — job titles, compensation, job codes, manager relationships. If you wait until data migration to resolve conflicts, you’ll be making high-pressure decisions when timelines are tight.

Then clean the data:

* Standardize fields (e.g., map “Manager” in the legacy system to “MGR” in the new platform)
* Resolve duplicate records
* Fix broken reporting relationships
* Correct invalid or missing information

Clean inputs make configuration faster, more accurate, and easier to test.

You also need to decide whether you’ll migrate historical data or current-state data only (for example, performance reviews from the last two years). Some regions have data retention requirements that may limit your options. Don’t overlook this step, since delaying this decision can stall migration and testing later.

**Signs You’re Ready** You’ve inventoried the data sources, defined the authoritative fields, cleaned the data, and mapped the data migration.

## Phase 4: Translate Requirements Into System Rules

Phase 4 is about turning business goals into actionable system rules, preparing [UAT (user experience testing)](https://www.panaya.com/blog/testing/what-is-uat-testing/), and finalizing your migration plan.

### Define the Business Logic

The vendor can’t configure “better reporting,” but they can configure clear, rule-based logic. This phase is about removing ambiguity. Every vague requirement you leave unresolved here becomes a delay or defect later. Some examples to get you started:

* **401(k) eligibility:** After 90 calendar or work days?
* **PTO approvals:** Under 3 days = manager; over 3 days = manager + department head
* **Workflow dependencies:** New hire → background check → IT order → manager notification

### Write UAT Scenarios Before Configuration Starts

**Why it matters:** I’ve worked closely with software QA teams, and test writing is a big time investment. If UAT scripts aren’t ready when configuration finishes, testing becomes rushed, defects slip through, and go-live dates start to move.

Developing UAT scenarios early reduces downstream risk and protects your delivery timelines. As configuration progresses, define acceptance criteria that directly support agreed business outcomes and user success, with clear pass/fail expectations.

Engage a small but representative group of stakeholders — business owners, project leads, and end users — to confirm priorities and validate what “done” looks like. Focus scenarios on core business processes and critical user roles.

Each UAT scenario should clearly state:

* The impacted business process
* Required prerequisites (data, access, environment readiness)
* Key execution steps
* Expected outcomes

Include integrations and edge cases to ensure testing reflects real operating conditions.

### Choose Your Migration Strategy

Decide how you’ll move from the old system to the new one. The table below shows the most common options.

| Type of Migration | Timeline                                                   | Top Benefit                        | Top Drawback                       |
| ----------------- | ---------------------------------------------------------- | ---------------------------------- | ---------------------------------- |
| Big bang          | Single cutover after \~2-4 months prep                     | Fastest, full switchover           | Highest disruption/risk at go‑live |
| Phased            | 4-5 months per module (e.g., 16-25 months for 4-5 modules) | Lower risk, easier troubleshooting | Slower time to full value          |
| Parallel run      | 1-3 cycles over \~1-3 months                               | Safest for payroll accuracy        | Most resource‑intensive            |

Whichever approach you choose, you’ll perform a dry run with a sample dataset (Phase 6) to test payroll in both systems, reconcile results, fix issues, and repeat until outcomes are accurate and repeatable.

Don’t move to Phase 5 until your data is in order and you’re configuration-ready. Any ambiguity you carry forward will surface later — when fixes are slower, more expensive, and more stressful.

**Signs You’re Ready** Your team has translated requirements into business logic, prepared UAT scenarios, and performed a successful dry run.

## Phase 5: Build With Your Vendor (Without Losing Control)

This is the implementation phase, where plans turn into system behavior. It’s also the phase where decisions must happen quickly and often default to the vendor if your team can’t step up. Ownership and discipline around decision-making become essential at this stage, as rollout can take months.

For most mid-sized to large companies, the HR implementation timeline can extend to **9-12 months**. Smaller organizations move faster, taking anywhere from 3 to 9 months, because there’s less data and complexity.

That’s why getting clear on who owns what is critical before decisions start compounding.

![HRIS Implementation Tips]()

### Clarify Ownership Between You and the Vendor

Think of the implementation as a partnership with clearly defined lanes. You’ll share execution with the vendor, but accountability stays with you.

| What You Own                                                                                                                 | What the Vendor Owns                                                                                        |
| ---------------------------------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------------------------------------------- |
| Deciding how the business should run Maintaining data quality and readiness Handling internal change management and adoption | Planning and setting up the system configuration Designing the integrations Training HR admins and managers |

There’s always a gray area where things shift, plans change, and trade-offs arise. The vendor can explain what’s technically possible and what it will cost in time or effort, but you need to take the lead on decisions that affect the business.

Once you’ve clarified ownership, convert requirements into actual business behavior with your implementer.

### Run Early System Testing

Here’s how your team will be setting up your HR system:

1. Finalize the configuration blueprint (e.g., modules, countries, pay groups).
2. Configure core HR, payroll, time, and benefits based on signed-off requirements.
3. Set up integrations and single sign-on.
4. Load initial test data and run configuration sessions with real scenarios.

Once that’s done, your internal team’s job is to stress-test the system using actual scenarios. Here’s an example:

“Show me what happens when someone moves from hourly to salary mid-pay period, including how their benefits eligibility and tax calculations update.”

As you go through these scenarios, you’ll notice what works and what doesn’t. You want to catch the gaps now while changes are quick and cheap, not later during UAT, when the timeline is tight and fixes are painful.

And as the build takes shape, you’ll start running into decisions about what should change and what must stay as-is.

### Protect Non-Negotiables & Decide Where to Compromise

You won’t get everything exactly the way your old system worked, which is why it’s critical to be clear about what truly matters. To stay focused, start by identifying the differences you’re not willing to compromise on.

Non-negotiables include:

* Workflows that are central to how your organization operates
* Compliance requirements, such as labor laws, breaks, and overtime rules
* Payroll accuracy, including taxes, multi-state handling, and deductions

If any of these fail, you’re off track and might need to check the configuration.

After that, the conversation shifts to where you can be flexible without creating real risk.

For example, if your current system shows PTO balances and approved time off correctly but doesn’t clearly show what an employee’s balance will look like in the future, plugging that gap may not be a priority. HR can still provide periodic project reports for planning.

You’ll need to make many such decisions as the system takes shape and the business keeps moving. As Brian explained:

![Brian Rivers]()

Organizations evolve during implementation: employees turn over, pay structures change, new benefit plans roll out, and mergers or reorganizations can shift priorities. Clear, continuous communication about these changes ensures they are captured early, reducing rework and avoiding misalignment between the system design and the real business environment.

Brian Rivers

Director of Professional Services, [PDS](https://www.pdssoftware.com/)

**Signs You’re Ready** You’ve defined responsibilities, stress-tested the system, and documented what’ll change and what stays the same.

## Phase 6: User Acceptance and Go-Live Simulation

This is your last low-risk opportunity to catch problems before they affect real paychecks and employee trust. You’ll validate core scenarios, test edge cases and payroll accuracy, and finish with a dry run that simulates the real cycle end-to-end.

![HRIS Implementation Tests]()

### Validate Core End-to-End Scenarios (UAT)

As the HR lead, user acceptance testing is primarily your responsibility because you know the actual scenarios and business rules. The vendor’s role here is to support you with the test environment, technical assistance, and sometimes, baseline test cases.

To validate scenarios effectively, you need a structured approach to testing. Brian emphasized that orgs should fully test critical interfaces and integrations before go-live to reduce risk and ensure maximum value. These integration points are often where issues surface first.

![Brian Rivers]()

A common interface would be payroll data flowing into the ERP/General Ledger. This is something that is required for all projects…is the data summarized or in detail? What frequency\\format is required? Will the payroll data be accrued based on days worked?

Brian Rivers

Director of Professional Services, [PDS](https://www.pdssoftware.com/)

Questions like these help confirm not just that data moves, but that it moves correctly and in a way downstream systems expect.

From there, testing should extend beyond individual integrations to full, end-to-end business scenarios.

At a minimum, test full employee lifecycle scenarios like:

* **New hire:** Offer letter → onboarding tasks → IT notifications → first payroll run
* **Transfer:** Moves across departments/locations/pay structures and whether approvals, cost centers, and benefits adjust correctly
* **Termination:** Final pay, PTO payouts, and access removal

Walking through these scenarios shows you the basic flow, but it doesn’t prove the system is truly ready. Even if [the happy path](https://www.youtube.com/watch?v=LV0w34gLqpA) looks good, the real risks usually hide in situations that don’t arise every day.

### Test the Edge Cases

It’s critical to test the edge cases that can quietly break an otherwise “working” system.

Here are some examples:

* Mid-pay-period hires or terminations (confirm prorated calculations)
* Employees in multiple roles (validate correct pay rate application)
* Retro pay adjustments (check that YTD totals and tax calculations update correctly)

Once you’re confident the system behaves correctly in both common and tricky scenarios, the next step is making sure payroll calculations match reality.

### Do a Dry Payroll Run

A dry run confirms the full cycle will execute cleanly under real conditions. If it feels redundant to do this alongside UAT, just remember that UAT can pass and still produce the wrong paycheck, which is why you need UAT and a dry run. Here’s how to think about the differences:

| **Pre-production testing** | Tells you whether the system works. | E.g., generating a paycheck.                                           |
| -------------------------- | ----------------------------------- | ---------------------------------------------------------------------- |
| **Dry run**                | Proves whether the outcome works.   | E.g., generating a paycheck with accurate deductions and compensation. |

Plan to trigger the dry run about two weeks before go-live. These are the steps you need to take:

* Freeze the old system
* Export final data
* Load it into the new system
* Reconcile reports, counts, pay totals, and leave balances
* Time every step to ensure the process fits within your go-live window

Alternatively, you can run payroll in both your new and old system for one to two full cycles and reconcile results.

Any difference indicates a data or configuration issue. Plan at least a week to fix and retest — this is an example of why you want to build some buffer into your HRIS implementation timeline.

**Signs You’re Ready** Most scenarios passed, payroll reconciled accurately, and the dry run confirmed the full cycle will execute cleanly at go-live. A few edge cases may still require attention, but your team has resolved major risks.

## Phase 7: Go-Live and the First 12 Weeks (Hypercare)

Go-live is a major milestone, but once you’ve actually flipped the switch, your journey isn’t over yet. At this point, your focus must shift from **“we made it” to “let’s make it work smoothly.”**

Brian told me that a realistic first-year roadmap begins with hypercare to work through any issues not identified earlier.

The goal of hypercare is to give you the confidence the system is stable. In this phase, you’ll typically move through three stages: intensive monitoring in weeks 1-2, stabilization through weeks 3-12, and finally a structured transition to everyday operations.

### Week 1-2: Intensive Monitoring

Focus on daily monitoring. This is where small issues either get resolved or become long-term problems.

**What to track daily:**

* Support ticket volumes and patterns
* User adoption metrics (logins, task completion rates)
* Payroll accuracy through spot checks

**Why this matters:** You need to quickly identify whether an issue is due to user confusion, missing training, or a configuration gap. For example, a spike in password reset requests might just mean users need clearer instructions, while a pattern of incomplete PTO requests could signal a workflow problem that needs immediate attention.

Set up a feedback loop from the start. Capture user suggestions and questions to update documentation, refine processes, and identify early improvements. The employee who says “I can’t figure out how to do X” is giving you valuable feedback about where the system isn’t working for them.

### Weeks 3-12: Stabilization

As people settle into using the system, shift from daily triage to weekly trend analysis. You’re no longer reacting to every ticket, you’re looking for patterns that point to systemic issues or areas for improvement.

* Group issues by category to spot recurring problems
* Identify configuration tweaks that could resolve multiple tickets
* Track training gaps where users consistently struggle with the same workflows

Start with the small fixes, like cleaning up confusing field labels, adding help where people tend to get stuck, and sharing FAQs based on common user queries and doubts. Once those are in place, tackle a few bigger changes that remove everyday friction, like ambiguous approval steps that slow things down.

Along the way, call out early wins and success stories, and celebrate adoption milestones to keep the momentum going and show people the system is working.

**Transfer Knowledge to Operations**

As confidence grows, begin shifting ownership to operations. Update your knowledge base with actual scenarios and instructions for when users encounter an issue.

Train your support team on the business logic behind decisions, so when someone asks, “Why does the system do it this way?” six months later, they have a clear answer. That’ll avoid managers making unwarranted changes to the system.

**Plan for Ongoing Training**

Training must continue after go-live. New hires will need onboarding, process changes will require retraining, and vendor updates will introduce features that need explaining.

As Brian noted:

![Brian Rivers]()

Continued learning should follow \[the hypercare period\], supported by lunch-and-learn sessions, training opportunities, and relevant conferences. Ongoing internal training, exploration of new features, and identifying ways to further drive employee engagement with the system help ensure continuous improvement.

Brian Rivers

Director of Professional Services, [PDS](https://www.pdssoftware.com/)

Continuous improvement is the natural next step once reactive troubleshooting starts to taper off, which should start happening by weeks 8-12\. By this time, you’re no longer fixing individual issues. Rather, you’re working to smooth out processes and improve usability now that you have a clearer view of how people work with the new system.

### Close Out Hypercare

As system stability increases, you can begin closing out hypercare. The goal is to move out of the project mode into daily operations.

Refer back to the benchmarks you set earlier in the project and assess whether the system is performing as expected. If you’re still relying on workarounds or manual corrections by month two, that’s a red flag signaling a deeper issue that needs attention now before it becomes embedded in daily operations.

At the 12-week mark, hold a formal review. Capture lessons learned, update your internal playbook, and formalize ownership so the system is embedded into operations.

**Confidence Checkpoint** You’re seeing fewer issues, a consistent rise in adoption, and the team has shifted from firefighting to continuous improvement.

## The First Year After Go-Live: From Stabilization to ROI

To make the most of your HR implementation, treat the first year as a continuation of the rollout and stabilization you achieved during the hypercare period.

![HRIS Implementation After Go-Live]()

### Measure Impact Against Your Original Purpose

Remember the single-sentence business driver you articulated in Phase 0? Now is the time to validate whether the system is delivering on it.

Here are some examples of outcomes to track:

* **Time savings:** HR admin hours before vs. after (be honest about actual savings versus tasks that were just shifted elsewhere)
* **Adoption rates:** Manager self-service usage and employee portal logins
* **Accuracy:** Payroll error rates and manual corrections per cycle
* **Experience:** Quarterly satisfaction surveys and support ticket trends
* **Compliance:** Reporting accuracy and audit data retrieval time

Hold quarterly reviews with leadership to assess what’s working, what isn’t, and what needs adjustments. Use the checkpoints below to see if you’re on the right track:

* **By month 3-4:** Core operations feel routine.
* **By month 6:** Measurable gains in time savings, adoption, and accuracy. By this time, you should be able to calculate actual time savings and adoption gains. If results aren’t improving, don’t assume they’ll fix themselves — get to the root cause.
* **By year one:** A clear next-iteration roadmap and a support model that no longer depends on your original project team.

Some common reasons that you may struggle to see results include inadequate training, change management gaps, and a mismatch between the system and how work actually happens. If that’s the case, run user sessions to identify where friction exists and why.

### Capture Lessons Learned

Around six months post-launch, run a retrospective with your core team. Document what went well, what took longer or cost more, what you’d do differently next time, and what you should know the next time around. What you learn now will determine how effective — and how costly — your next rollout will be.

### Plan the Next Iteration

Once core operations stabilize, you can start planning for the next iteration. Prioritize additional features by the value addition to your business. Will they save time, boost productivity, or automate compliance? Don’t forget to check the interplay between various features. You don’t want to roll out a new module only to have it break something.

You’ll also need to identify the executive sponsor, if they’re different for the next phase, and establish what the budget will be.

## Implementation Is Hard, Structure Makes It Manageable

Running an HRIS implementation isn’t easy, but the time you invest now will save months of rework later. These seven phases give you the structure you need when there are more decisions to make than time.

In the end, success boils down to not what you implement, but how deliberately you move through the work.

[ Previous Workday vs. SAP SuccessFactors ](https://www.selecthub.com/hr-management/workday-and-successfactors/) 

[ Next HRIS Integration ](https://www.selecthub.com/hr-management/hris-integration/) 

### Trending Topics

#### [HR Management](https://www.selecthub.com/category/hr-management/)

[HRIS vs. HRMS vs. HCM Explained](https://www.selecthub.com/hr-management/difference-hcm-hrms-hris/) 

[Your company’s looking for new HR software, so your boss asked you to do some… ](https://www.selecthub.com/hr-management/difference-hcm-hrms-hris/)

[ ![Ritinder Kaur](https://www.selecthub.com/wp-content/uploads/2021/06/cropped-Ritinder-Kaur-v2-1-96x96.png) Ritinder Kaur ](https://www.selecthub.com/author/ritinder-kaur/) Apr 08, 2026 

#### [HR Management](https://www.selecthub.com/category/hr-management/)

[My In-Depth Review of the Best HR Apps in 2026](https://www.selecthub.com/hr-management/the-three-types-of-hr-applications/) 

[“We need a better HR app.” The moment you admit it, the weight of the… ](https://www.selecthub.com/hr-management/the-three-types-of-hr-applications/)

[ ![Ritinder Kaur](https://www.selecthub.com/wp-content/uploads/2021/06/cropped-Ritinder-Kaur-v2-1-96x96.png) Ritinder Kaur ](https://www.selecthub.com/author/ritinder-kaur/) Mar 12, 2026 

#### [HR Management](https://www.selecthub.com/category/hr-management/)

[Why 42% of HR Software Integration Projects Fail (and How to Avoid the Same Fate)](https://www.selecthub.com/hr-management/hris-integration/) 

[Key Takeaways Define data ownership first. There must be one master source of employee data,… ](https://www.selecthub.com/hr-management/hris-integration/)

[ ![Harold Ford](https://www.selecthub.com/wp-content/uploads/2025/12/Harold-Ford-96x96.png) Harold Ford ](https://www.selecthub.com/author/harold-ford/) Mar 12, 2026 

#### [HR Management](https://www.selecthub.com/category/hr-management/)

[HR Trends for 2026: Analyzing the Future of Human Resource Management](https://www.selecthub.com/hr-management/hr-trends/) 

[Like every ship needs a captain, every business needs human resource management to steer it… ](https://www.selecthub.com/hr-management/hr-trends/)

[ ![Olivia Edens](https://www.selecthub.com/wp-content/uploads/2023/05/cropped-Olivia-Headshot-96x96.jpg) Olivia Edens ](https://www.selecthub.com/author/olivia-edens/) Mar 12, 2026 

#### [HR Management](https://www.selecthub.com/category/hr-management/)

[Top 21 HR Software Requirements + Free Template](https://www.selecthub.com/hr-management/hr-software-features-requirements-list/) 

[Choosing HR software isn’t just about how many features a system has — it’s about… ](https://www.selecthub.com/hr-management/hr-software-features-requirements-list/)

[ ![Ritinder Kaur](https://www.selecthub.com/wp-content/uploads/2021/06/cropped-Ritinder-Kaur-v2-1-96x96.png) Ritinder Kaur ](https://www.selecthub.com/author/ritinder-kaur/) Mar 12, 2026 

#### [HR Management](https://www.selecthub.com/category/hr-management/)

[Workday vs. SuccessFactors 2026 Comparison: Which HCM Platform Should You Choose?](https://www.selecthub.com/hr-management/workday-and-successfactors/) 

[You’re looking for a new HR system and the stakes are high. The right platform… ](https://www.selecthub.com/hr-management/workday-and-successfactors/)

[ ![Ritinder Kaur](https://www.selecthub.com/wp-content/uploads/2021/06/cropped-Ritinder-Kaur-v2-1-96x96.png) Ritinder Kaur ](https://www.selecthub.com/author/ritinder-kaur/) Mar 12, 2026 

Originally published in August 2024 and last updated in August 2026\. Contributions from Ritinder Kaur, Zachary Totah, Brian Rivers, Cory Ondo, and Sandesh Sindiri. 

## About the Contributors

The following SelectHub team members and subject matter experts helped research, create, and review this content. 

[ ](https://www.selecthub.com/author/ritinder-kaur/) 

Written by  
[Ritinder Kaur](https://www.selecthub.com/author/ritinder-kaur/) 

HR Tech Writer

Ritinder Kaur is a Senior Technical Content Writer at SelectHub and has ten years of experience writing about B2B software and quality assurance. She has a Masters degree in English language and literature and writes about Business Intelligence and Data Science. Her articles on software testing have been published on Stickyminds.

[See Full Bio](https://www.selecthub.com/author/ritinder-kaur/)

[ ](https://www.selecthub.com/author/zachary-totah/) 

Edited by  
[Zachary Totah](https://www.selecthub.com/author/zachary-totah/) 

Content Manager & Editor

As SelectHub's Content Manager, Zac is in charge of content across diverse categories including CRM, ERP, HR, medical and project management. He has over 6 years of experience writing and editing for B2B tech and holds a B.A. in communications. His work is driven by his goal of making it less overwhelming for people to find software for their business.

[See Full Bio](https://www.selecthub.com/author/zachary-totah/)

[ ](https://www.selecthub.com/author/brian-rivers/) 

Contributions by  
[Brian Rivers](https://www.selecthub.com/author/brian-rivers/) 

HR Implementation Leader

Brian Rivers is the Director of Professional Services at PDS. He leads a team of highly tenured Implementation Specialists, Project Managers, and Account Managers, guiding both new implementations and ongoing account management efforts. Brian brings a unique and valuable perspective to PDS, having been a payroll/ERP customer and system user before joining the organization in 2017\. With over eight years at PDS, Brian has built deep expertise across payroll and ERP systems and a strong understanding of the customer experience. He began his career at PDS as an Implementation Consultant, where for more than four years he successfully led full-cycle implementation projects and partnered closely with customers throughout deployment. For the past four years, Brian has served as Director, providing strategic leadership and oversight to the implementation team while ensuring successful project delivery, smooth customer onboarding, and continued client success. His background spans hands-on system knowledge, project leadership, and the management of customer-facing operations.

[See Full Bio](https://www.selecthub.com/author/brian-rivers/)

[ ](https://www.selecthub.com/author/cory-ondo/) 

Contributions by  
[Cory Ondo](https://www.selecthub.com/author/cory-ondo/) 

SVP, Implementation & Customer Service

Cory Ondo is the Senior Vice President, Implementation & Customer Service at Paycor. Cory joined Paycor in 2007 as an Implementation Consultant and has since served as a CX Executive, leading teams in Implementation, Product, Analytics, Customer Service, and Customer Experience. Throughout his tenure, he has focused on scaling, transforming, and optimizing functions. Cory leads with curiosity, collaboration, and a customer-obsessed mindset. He attended Miami University and lives in Cincinnati with his wife and three children (ages 16, 14, and 12).

[See Full Bio](https://www.selecthub.com/author/cory-ondo/)

[ ](https://www.selecthub.com/author/sandesh-sindiri/) 

Contributions by  
[Sandesh Sindiri](https://www.selecthub.com/author/sandesh-sindiri/) 

Senior Director of Software Solutions and Technology Research

In his role as Senior Director of Software Solutions and Technology Research, Sandesh oversees an in-house team of analysts, guiding them in conducting complex research analyses across various software categories while establishing best practices and methodologies. Sandesh is also SelectHub's Head of Software Selection and Procurement Services. In this capacity, he leads a team of analysts in providing end-to-end solutions for clients, from collating requirements and developing architecture to conducting total cost of ownership analysis and negotiating contracts.

[See Full Bio](https://www.selecthub.com/author/sandesh-sindiri/)

Ritinder KaurWorkday vs. SuccessFactors 2026 Comparison: Which HCM Platform Should You Choose?

* ‹
* ›

###  Conversation (1) 

![Avatar](https://secure.gravatar.com/avatar/281d3616cf761f3582c0d76c23517846?s=32&d=mm&r=g) Write a response 

[Cancel reply](https://www.selecthub.com/hr-management/key-considerations-implementing-hr-system/#respond)

Your message

Your name \*

Your email \*

Website

Save my name, email, and website in this browser for the next time I comment.

* ![Avatar photo](https://secure.gravatar.com/avatar/597819931e16d984c28b17ab0c4e3af46e2762501f4a30244e51a9b1c9b26bf0?s=96&d=mm&r=g)  
#### **ANKUSH**  \- June 22, 2020  
very helpful

**[Reply](#comment-39878)**

Compare 

**Tier 1:**  
Fully/moderately supported out-of-the-box allowing for quick and easy deployment.  
Fully or moderately supported out-of-the-box with industry-leading capabilities and is immediately available after installation without needing any add-ons, integrations, or custom development. 

**Tier 2:**  
Supported with workarounds or add-ons that may require additional costs.  
Not directly available in the software, but can be accomplished using other built-in features, workarounds, or add-ons/products from the vendor with or without any additional cost. 

**Tier 3:**  
Requires partner integrations or custom development that is often at an additional cost.  
Requires additional integrations, plugins, marketplace applications from a third-party vendor, or custom development using the APIs, libraries, extensions, and development framework supported by the software, with or without any additional cost. 

[Close](#)

```json
{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/#article","isPartOf":{"@id":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/"},"author":{"name":"Ritinder Kaur","@id":"https:\/\/www.selecthub.com\/#\/schema\/person\/7ef713c9c022e75ea5995d3c1cd516b2"},"headline":"HRIS Implementation Done Right: A 7-Phase Field Guide for HR Leaders","datePublished":"2024-08-13T20:52:42+00:00","dateModified":"2026-08-13T15:59:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/"},"wordCount":5130,"commentCount":1,"publisher":{"@id":"https:\/\/www.selecthub.com\/#organization"},"articleSection":["HR Management"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/","url":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/","name":"HRIS Implementation Field Guide for HR Leaders","isPartOf":{"@id":"https:\/\/www.selecthub.com\/#website"},"datePublished":"2024-08-13T20:52:42+00:00","dateModified":"2026-08-13T15:59:45+00:00","breadcrumb":{"@id":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.selecthub.com\/hr-management\/key-considerations-implementing-hr-system\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.selecthub.com\/"},{"@type":"ListItem","position":2,"name":"HR Management","item":"https:\/\/www.selecthub.com\/category\/hr-management\/"},{"@type":"ListItem","position":3,"name":"HRIS Implementation Done Right: A 7-Phase Field Guide for HR Leaders"}]},{"@type":"WebSite","@id":"https:\/\/www.selecthub.com\/#website","url":"https:\/\/www.selecthub.com\/","name":"SelectHub","description":"Confidence in Software","publisher":{"@id":"https:\/\/www.selecthub.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.selecthub.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.selecthub.com\/#organization","name":"SelectHub","url":"https:\/\/www.selecthub.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.selecthub.com\/#\/schema\/logo\/image\/","url":"","contentUrl":"","caption":"SelectHub"},"image":{"@id":"https:\/\/www.selecthub.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/selecthub\/","https:\/\/x.com\/SelectHub","https:\/\/www.linkedin.com\/company\/selecthub"]},{"@type":"Person","@id":"https:\/\/www.selecthub.com\/#\/schema\/person\/7ef713c9c022e75ea5995d3c1cd516b2","name":"Ritinder Kaur","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.selecthub.com\/wp-content\/uploads\/2021\/06\/cropped-Ritinder-Kaur-v2-1-96x96.png","url":"https:\/\/www.selecthub.com\/wp-content\/uploads\/2021\/06\/cropped-Ritinder-Kaur-v2-1-96x96.png","contentUrl":"https:\/\/www.selecthub.com\/wp-content\/uploads\/2021\/06\/cropped-Ritinder-Kaur-v2-1-96x96.png","caption":"Ritinder Kaur"},"description":"Ritinder Kaur is a Senior Technical Content Writer at SelectHub and has ten years of experience writing about B2B software and quality assurance. She has a Masters degree in English language and literature and writes about Business Intelligence and Data Science. Her articles on software testing have been published on Stickyminds.","sameAs":["https:\/\/www.selecthub.com","https:\/\/www.linkedin.com\/in\/ritinder-kaur\/"],"url":"https:\/\/www.selecthub.com\/author\/ritinder-kaur\/"}]}
{
    "@context": "https://schema.org",
    "@type": "Article",
    "headline": "HRIS Implementation Done Right: A 7-Phase Field Guide for HR Leaders",
    "author":{
      "@type": "Person",
      "name": "Ritinder Kaur",
      "url": "https://www.selecthub.com/author/ritinder-kaur/",
      "jobTitle":"HR Tech Writer",
      "image": "https://www.selecthub.com/wp-content/uploads/2021/06/cropped-Ritinder-Kaur-v2-1-96x96.png"
    },    
    "publisher":{
      "@type": "Organization",
      "name": "SelectHub",
      "logo": {
        "@type":"ImageObject",
        "url": "https://www.selecthub.com/wp-content/uploads/2019/10/favicon.png"
      }
    },
    "datePublished": "2024-08-13T15:52:42-06:00",
    "dateModified": "2026-08-13T09:59:45-06:00",
    "mainEntityOfPage": "https://www.selecthub.com/hr-management/key-considerations-implementing-hr-system/"	
  }
```